01 · Agricultural / Hospitality

Jordan Wine Estate, Stellenbosch

Vector's flagship operating proof point: Solar PV, battery energy storage, Hybrid UPS / power conversion, grid interface, metering and monitoring integrated within an operating commercial environment.

At Jordan Wine Estate in Stellenbosch, the installed system combines 490 kWp of Solar PV with 645 kWh of battery energy storage, Hybrid UPS / power conversion, grid interface, metering and monitoring within one integrated commercial energy system under a long-term PPA.

Explore Jordan In Operation
645kWh
BESS Capacity
490kWp
Solar PV
Hybrid UPS
System Type
System
Integrated Hybrid UPS / Power Conversion
Solar
490 kWp Solar PV
Storage
645 kWh BESS
Grid Interface
Metered grid and site electrical interface
Monitoring
Huawei SmartLogger5000B
Status
✓ Commissioned Feb 2026
  • Hybrid UPS / power conversion integrated within the operating system
  • BESS / Solar PV integration
  • Grid interface, metering and monitoring integrated within the site system
  • LV and control infrastructure
  • Ongoing operating visibility within contracted scope

Commissioned: February 2026 · Group-Delivered Project

02 · Industrial

Industrial Site — Killarney Gardens

Cape Town, Western Cape

A large-scale Grid-Tied energy system integrating Solar PV, battery energy storage and supporting electrical infrastructure for an industrial manufacturing environment. The project combines generation, storage, grid interface, LV infrastructure, switchgear, protection and metering within an integrated site solution.

Client naming and further technical detail remain publication-controlled.

Aerial view of the industrial Killarney Gardens energy site
Electrical equipment at the Killarney Gardens industrial energy site
Containerised electrical infrastructure at the Killarney Gardens site
Grid-Tied
Grid Interface
2MWh
BESS Capacity
2MWp
Solar PV
System
Grid-Tied System
Solar
2MWp Solar PV
Storage
2MWh BESS
Grid Interface
Grid-Tied System
Electrical Works
LV room, switchgear & metering
Status
✓ Commissioned & Operational
  • Grid-Tied system integrating Solar PV and battery energy storage
  • Integrated battery storage, solar generation and controlled grid input
  • Full electrical infrastructure works
  • LV room design, supply and full installation
  • Switchgear, protection and metering works

EPC-Delivered Project · Cape Town, Western Cape

03 · Commercial / Retail

Rembrandt Mall

Paarl, Western Cape

A commercial-scale Hybrid UPS, battery storage and Solar PV deployment supporting a multi-tenant retail environment. The project integrates generation, storage, power conversion, grid interface, metering and electrical infrastructure around the site's operating and continuity requirements.

Rooftop Solar PV installation at Rembrandt Mall
Battery energy storage equipment room at Rembrandt Mall
Power conversion equipment at Rembrandt Mall
1.2MWh
BESS Capacity
1.2MWp
Generation
Hybrid UPS
System Type
System
Integrated Hybrid UPS / Power Conversion
Solar
1.2MWp Rooftop Solar PV
Storage
1.2MWh BESS
Application
Commercial Retail — Multi-tenant
Electrical Works
Full DB, metering & protection
Status
✓ Commissioned & Operational
  • Hybrid UPS / power conversion integrated with the site energy system
  • Battery energy storage integrated with Solar PV and site electrical infrastructure
  • Full electrical infrastructure and DB works
  • Grid integration, metering and protection systems

EPC-Delivered Project · Paarl, Western Cape

Project names, attribution, imagery and technical details are published only where appropriate permissions exist. No unpublished engagement, client relationship or project outcome should be inferred from the material shown.

Start the conversation

See Whether Your Site May Qualify.

Choose the route that fits where you are.

Request a commercial energy assessment or speak to the commercial team. Vector will review your load profile, tariff exposure, continuity requirements and funding suitability to determine whether a funded infrastructure solution may be appropriate.